Disgrifiad
5454 aluminum plate is a typical rust-proof aluminum. Its strength is about the same as that of 5154, tua 20% greater than that of 5052 alwminiwm.
yr 5454 grade aluminum was developed for use in the manufacture of dalennau alwminiwm into tank, dry bulk trailers and dump bodies. aloi alwminiwm 5454 has very good corrosion resistance, in particular to seawater and general environmental conditions.
AL 5454 is a non-heat treatable alloy of aluminum and magnesium. It is a moderate strength alloy that may be hardened (strengthened) by cold working
Alloy 5454 plât alwminiwm is widely used in the manufacture of chemical storage tanks, automotive wheels and in particular those applications that may be subject to temperatures in excess of 150ºF.
Enw Alwminiwm:
1000 cyfres:1050,1060,1070,1080,1100,1145,1200,1235, ac ati.
2000 cyfres:2014,2017,2018,2024,2025,2219, 2219,2618a etc.
3000 cyfres:3003,3004,3102,3104,3105,3005, ac ati.
4000 cyfres:4032,4043, 4017, ac ati
5000 cyfres: 5005,5052,5454,5754,5083,5086,5182,5082, ac ati.
6000 cyfres:6061,6063,6262,6101, ac ati
7000 cyfres:7072,7075,7003 ac ati
8000 cyfres: 8011, ac ati.
Maint y daflen alwminiwm
trwch:0.2-6.0mm
lled:100-2400mm
hyd:200-11000mm
Coil mam: CC neu DC
pwysau: Tua 2mt y paled ar gyfer maint cyffredinol
MOQ: 5-15 tunnell fesul maint
Amddiffyniad: papur rhyng-haen, ffilm wen, ffilm las, ffilm du-gwyn, ffilm wedi'i rhwymo'n ficro, yn ôl eich gofynion.
Arwyneb: yn lân ac yn llyfn, dim brycheuyn llachar, cyrydu, olew, slotiedig, ac ati.
Cynnyrch safonol: GBT3880, JIS4000, EN485, ASTM-B209
Amser dosbarthu: tua 30 diwrnod ar ôl derbyn blaendal
Be free from Oil Stain, Dent, Inclusion, Scratches, Stain, Oxide Discoloration, Breaks, Corrosion, Roll Marks, Dirt Streaks and other defect which will interfere with use
Surface without black line, clean cut, periodic stain, roller printing defects, such as other internal Control standards.
You can’t see any tiny space between the plates when they are piled up. And the surface is smoothly without freckles.
We have strict and professional procedures of production:
(1)Before Producing :
Assurance of compliance the standard and material according to customer’s order;
Making production plan according to customer’s order ;
Starting producing after receiving the payment from customer
(2)Finished production :
Chemical test and Mechanical test by our quality department, Visual examination
Thickness measurement (Continuous Ultrasonic)
Length dimension control.
Flatness,Straightness,Visual & Dimension check of edge
Weight control
Marking
(3)checking before delivery :
Checking for packages
Certificate of compliance
Checking for Shipping mark and quantity
-
-
-